Skip to content
ÖPNV Dresdenunofficial
Unofficial community project, not affiliated with VVO or DVB. Data may be incomplete or out of date. Contribute on GitHub

Downloads

GitHub Actions check the sources daily (GTFS weekly) and commit only real changes, so the git history doubles as an archive. The links below always point to the latest version.

FileContentsSizeChanged
vvo-gtfs.zipWeekly GTFS feed for the VVO area, cut from the national feed by gtfs.de. See the GTFS docs for coverage and license.~6 MBreleases
stations.jsonAll stops with IDs, coordinates, operators and lines by mode.1.7 MB2026-11-23
stations.geojsonThe same stops as GeoJSON points, for maps.2.3 MB2026-11-23
stations.csvTabular list of stops with coordinates, operators and line counts.442 KB2026-11-23
stations_summary.mdStatistics on the network: stops per mode, operator and city.5 KB2026-11-23
gtfs/lines.csvWeekly summary of the GTFS snapshot: trips per weekday, first and last departure per line.37 KB2026-11-23
abbreviations_dresden.csvDVB stop codes in Dresden.13 KB2026-10-29
abbreviations_regional.csvDVB stop codes in the surrounding area.3 KB2026-10-26
liniennetzplan.pdfCurrent DVB network map.588 KB2026-02-20
liniennetzplan.jpgCurrent DVB network map as an image.1.6 MB2026-02-20

Official sources